Skip to Main Content

Croton Overlook DEIS Appendices

*Files with an asterisk are too large to post online. 

VIII.  APPENDICES
A. Draft Scope
  Draft Scope, Submitted February 8, 2011
B.
Adopted Scope and Resolution
  Adopted Scope and Resolution, Approved April 12, 2011
C.
Meeting Transcript and Written Comments
  Scoping Session Meeting Transcript, February 15, 2011
  Written Comments Part 1
  Written Comments Part 2
D.
Wetlands Survey, Delineation Report, and Confirmation Letter
  Wetland Survey - May 16, 2011
  Wetland Delineation Report - May 2011 (17 MB)
  Wetland Verification Letter, Cornerstone Associates - April 22, 2011
E.
Visual Impact Study
  Visual Impact Assessment, December 30, 2010 (31 MB)
  Sections: Map View, Sheet S/M-1
  Line of Site Sections, Sheet SS-1
  Line of Site Plan View 2, Sheet V-XL
  Line of Site Sections, Sheet SS-2
  Berm Map/Section View, Sheet BMS
  3-D Rendering of Viewscape from Bike Path, Post Construction (50 MB)*
F.
Stormwater Pollution Prevention Plan
  SWPPP Report through Appendix X (15 MB)
  Appendix XI: Erosion and Sediment Control Plans
     Preliminary Erosion Control Plans and Notes: Sheets C-8 and C-9
     Grading Plan: Sheet C-2
     Hydrological Analysis (170 MB)*
     Site Plan: Sheet C-1
     Test Pit Plan: Sheet C-7
G.
Preliminary Erosion Control Plans and Notes
  Preliminary Erosion Control Plans and Notes: Sheets C-8 and C-9
H.
Electromagnetic Field Study
  Electromagnetic Field Study, September 14, 2010
I.
Site Plans
  Site Plan: Sheet C-1
  Grading Plan: Sheet C-2
  Utility Plan: Sheet C-3
  Test Pit Plan: Sheet C-7
J.
Biodiversity Study
  Biodiversity Study, July 2011
K.
Blasting Plans
  Blasting Plans
L.
Preliminary Integrated Pesticide Management Plan
  Preliminary Integrated Pesticide Management Plan
M.
Environmental Phase 1 Report
  Environmental Phase 1 Report - May 2011 (14 MB)
N.
Environmental Plans
  Environmental Constraints: Sheet EN-1, May 14, 2011
  Rock Outcrops on Site: Sheet RO-1, May 10, 2011
  Soils Map View: Sheet SM-1, June 25, 2011
  Tree Survey: 2 sheets,  June 26, 2011
O.
Engineer's Report and Plans for Proposed Wastewater Treatment Facility
  Membrane Bioreactor Engineering Report, May 1, 2011
  WWTP Membrane System Drawings: 3 sheets, April 22, 2011
  WWTP Floor Plan: Sheet WT-1, June 29, 2011 (13 MB)
P.
Plans and Specifications for Pump Stations
  ABS Pump Specs
Q.
Flow Confirmation Letter
  Flow Confirmation Letter, October 25, 2010
R.
Wastewater Emergency Response Plan
  Wastewater Emergency Response Plan
S.
Construction Schedule
  Preliminary Construction Schedule
T.
Archeology Report
  Phase I Archaeological Study, Part 1 (12 MB)
  Phase I Archaeological Study, Part 2 (21 MB)
  Phase I Archaeological Study, Part 3 (18 MB)
U.
Traffic Analysis
  Traffic Assessment & Supplemental Analysis
V.
Water Budget and Plan
  Grading Plan (Water Budget): Sheet S-1
  Water Budget
W.
Groundwater Mounding Analysis
  Groundwater Modeling Report for On-Site Subsurface Wastewater Disposal System (18 MB)
X.
Alternate Plans
  R1-160 Cluster Subdivision
  R1-160 As-Of-Right Conceptual Subdivision Sketch (JPG)
  R1-160 As-Of-Right Conceptual Subdivision Sketch (PDF)