|
A. |
Draft Scope
|
|
|
Draft Scope, Submitted February 8, 2011
|
B.
|
Adopted Scope and Resolution
|
|
|
Adopted Scope and Resolution, Approved April 12, 2011
|
C.
|
Meeting Transcript and Written Comments |
|
|
Scoping Session Meeting Transcript, February 15, 2011
|
|
|
Written Comments Part 1 |
|
|
Written Comments Part 2 |
D.
|
Wetlands Survey, Delineation Report, and Confirmation Letter |
|
|
Wetland Survey - May 16, 2011
|
|
|
Wetland Delineation Report - May 2011 (17 MB) |
|
|
Wetland Verification Letter, Cornerstone Associates - April 22, 2011
|
E.
|
Visual Impact Study |
|
|
Visual Impact Assessment, December 30, 2010 (31 MB) |
|
|
Sections: Map View, Sheet S/M-1 |
|
|
Line of Site Sections, Sheet SS-1 |
|
|
Line of Site Plan View 2, Sheet V-XL |
|
|
Line of Site Sections, Sheet SS-2 |
|
|
Berm Map/Section View, Sheet BMS |
|
|
3-D Rendering of Viewscape from Bike Path, Post Construction (50 MB)* |
F.
|
Stormwater Pollution Prevention Plan |
|
|
SWPPP Report through Appendix X (15 MB) |
|
|
Appendix XI: Erosion and Sediment Control Plans |
|
|
Preliminary Erosion Control Plans and Notes: Sheets C-8 and C-9 |
|
|
Grading Plan: Sheet C-2
|
|
|
Hydrological Analysis (170 MB)* |
|
|
Site Plan: Sheet C-1 |
|
|
Test Pit Plan: Sheet C-7 |
G.
|
Preliminary Erosion Control Plans and Notes
|
|
|
Preliminary Erosion Control Plans and Notes: Sheets C-8 and C-9
|
H.
|
Electromagnetic Field Study |
|
|
Electromagnetic Field Study, September 14, 2010
|
I.
|
Site Plans |
|
|
Site Plan: Sheet C-1
|
|
|
Grading Plan: Sheet C-2
|
|
|
Utility Plan: Sheet C-3
|
|
|
Test Pit Plan: Sheet C-7
|
J.
|
Biodiversity Study
|
|
|
Biodiversity Study, July 2011
|
K.
|
Blasting Plans
|
|
|
Blasting Plans |
L.
|
Preliminary Integrated Pesticide Management Plan |
|
|
Preliminary Integrated Pesticide Management Plan |
M.
|
Environmental Phase 1 Report |
|
|
Environmental Phase 1 Report - May 2011 (14 MB) |
N.
|
Environmental Plans |
|
|
Environmental Constraints: Sheet EN-1, May 14, 2011
|
|
|
Rock Outcrops on Site: Sheet RO-1, May 10, 2011
|
|
|
Soils Map View: Sheet SM-1, June 25, 2011
|
|
|
Tree Survey: 2 sheets, June 26, 2011
|
O.
|
Engineer's Report and Plans for Proposed Wastewater Treatment Facility |
|
|
Membrane Bioreactor Engineering Report, May 1, 2011 |
|
|
WWTP Membrane System Drawings: 3 sheets, April 22, 2011
|
|
|
WWTP Floor Plan: Sheet WT-1, June 29, 2011 (13 MB) |
P.
|
Plans and Specifications for Pump Stations |
|
|
ABS Pump Specs
|
Q.
|
Flow Confirmation Letter |
|
|
Flow Confirmation Letter, October 25, 2010
|
R.
|
Wastewater Emergency Response Plan |
|
|
Wastewater Emergency Response Plan |
S.
|
Construction Schedule |
|
|
Preliminary Construction Schedule |
T.
|
Archeology Report |
|
|
Phase I Archaeological Study, Part 1 (12 MB) |
|
|
Phase I Archaeological Study, Part 2 (21 MB) |
|
|
Phase I Archaeological Study, Part 3 (18 MB) |
U.
|
Traffic Analysis |
|
|
Traffic Assessment & Supplemental Analysis
|
V.
|
Water Budget and Plan |
|
|
Grading Plan (Water Budget): Sheet S-1
|
|
|
Water Budget
|
W.
|
Groundwater Mounding Analysis |
|
|
Groundwater Modeling Report for On-Site Subsurface Wastewater Disposal System (18 MB) |
X.
|
Alternate Plans |
|
|
R1-160 Cluster Subdivision
|
|
|
R1-160 As-Of-Right Conceptual Subdivision Sketch (JPG)
|
|
|
R1-160 As-Of-Right Conceptual Subdivision Sketch (PDF) |